• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

Heritage and History

Buildings, plants, food and family history, culture and heritage ...

  • Contents
    • Downloads
  • Contact us
    • Website creation tools
    • About us
    • Privacy
  • Books on history, culture and heritage
  • Cookie policy
  • Cookie policy (UK)
  • Show Search
Hide Search
Home/Architecture/Greta Bridge, Keswick

Greta Bridge, Keswick

Carrying the busy A66 between the M6 and Keswick is what is possibly the largest concrete span bridge in Cumbria, the Greta Bridge.

Four lanes of thundering traffic pass over this bridge everyday, however many motorists are unaware of the valley below or what an achievement it was to build it.

The structure, is said to have been designed purely by engineers with no architectural input and is renowned for its aesthetic qualities which ensure it blends well with the surrounding Lake District countryside.

Greta Bridge, Keswick
Greta Bridge, Keswick

Opened in 1977 Greta Bridge spans the River Greta and is sandwiched between the edge of the town of Keswick and the fells including Latrigg.

Passing underneath the bridge is the National Cycle network route 71.

This path and the associated Keswick railway footpath uses the old track bed of the Keswick railway which closed in 1972.

Construction began on the bridge in 1974 and forms part of the Keswick Northern Bypass project.

With five spans the 220m long structure sits on very tall pillars spanning the valley below.

It was one of the longest bridges of it’s type at the time.

The bridge is said to be one of the first structures to be designed using finite element analysis.


Leading Expert

One of the major structural engineers involved in the bridge design and in particular the use of pre-stressed concrete in road building was Roy Rowe.

Greta Bridge, Keswick
Greta Bridge, Keswick

He devised mathematical formulae to work out stresses and loads on concrete structures and was to become one of the leading experts in the use of concrete as a building material in civil engineering.

Roy Rowe died of heart disease on December 18, 2008, aged 79.

Proud

Writing in the NCE (New Civil Engineer) Mr. Peter Donaldson who was the structures Agent for the main contractor Tarmac Construction, says that the building of Greta Bridge was not without difficulty.

Mr Donaldson writes “In plan, the bridge follows a reverse curve which requires a constantly changing carriageway crossfall from one abutment to the other. In turn, this varying crossfall geometry is repeated in the cross sectional alignment of the deck itself, resulting in webs which, although apparently vertical, are actually at right angles to the deck soffit and upper slab”.

Mr Donalson was writing to the letters section of the New Civil Engineer in response to the announcement that the Great Bridge had been nominated as Britain’s best civil engineering structure of the century (NCE 4 November 1999).

Mr Donaldson adds ”  I think I can speak for all of us involved in its construction when I say that we remain immensely proud of what we achieved”

Award winning

Best Civil Engineering Structure of the Century, Greta Bridge
Best Civil Engineering Structure of the Century, Greta Bridge

In 1977 the bridge was awarded a Highly Commendation by the Concrete Society.

Readers of Concrete magazine however voted it Best Civil Engineering Structure of the Century in 1999.

Beverley Hughes MP, Minister for the Environment, unveiled a plaque, which is positioned beneath the bridge.

The Plaque reads:- ‘GRETA BRIDGE Voted Best Concrete Engineering Structure Of The Century September 1999 / Consulting Engineer : Scott Wilson Kirkpatrick & Partners / Contractor : Tarmac Construction / Maintained by The Highways Agency.

Other links

The urban morphology of Keswick

Location details from Google Maps      54.605880, -3.114635 +54° 36′ 21.17″, -3° 6′ 52.69″ Link:


September 22, 2009 by admin Leave a Comment

Filed Under: Architecture, Transport Tagged With: A66, Abutment, Aesthetic Qualities, Brid, Bridg, Bridge Design, Building Material, Concrete Span, Concrete Structures, Finite Element Analysis, Footpath, lake district, Longest Bridges, Main Contractor, Mathematical Formulae, Mr Donaldson, New Civil Engineer, Peter Donaldson, Pre Stressed Concrete, Right Angles, River Greta, S Type, Soffit, Span Bridge, Structural Engineers

Reader Interactions

Leave a Reply Cancel reply

You must be logged in to post a comment.

Primary Sidebar

WWI Ruhleben Horticultural Society

Looking for Gardeners of Ruhleben

A story just published by Gardening For Health says the Royal Horticultural …

Continue Reading about Looking for Gardeners of Ruhleben

Sequoia Gigantea at Wrest Park

Perhaps the UK’s oldest recycled Christmas tree

Originally planted by the festively monikered Head Gardener of Wrest Park, …

Continue Reading about Perhaps the UK’s oldest recycled Christmas tree

Gowland Excavation 1901 (English Heritage Archive)

Who Built Stonehenge? Exhibition

A  special exhibition explores 800 years of debate about the creation of …

Continue Reading about Who Built Stonehenge? Exhibition

New Bells of Notre Dame Cathedral video

Hear the New Bells of Notre Dame

Just over 6 hours ago the new bells of Notre Dame Cathedral rang out exactly as …

Continue Reading about Hear the New Bells of Notre Dame

Staff member and inmates c 1927 Credit: National Trust

Women in the Workhouse exhibition

A fascinating ‘Women in The Workhouse’ exhibition opens on International Women’s …

Continue Reading about Women in the Workhouse exhibition

Footer

Copyright © 2026 ·Navigation Pro on Genesis Framework · WordPress · Log in

Manage Cookie Consent
We use technologies like cookies to store and/or access device information. We do this to improve browsing experience and to show (non-) personalised ads. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional cookies Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}